2019 PROJECTS

CONTRACTING PROCESS N °: ETR-GT-134-19 SECOND CALL FOR SUPPLY OF GATE-TYPE RETICULATED METALLIC STRUCTURES AND SUPPORT OF EQUIPMENT PROJECT OF 500 kV CARRASCO - SANTIVAÑEZ TRANSMISSION LINE AND ASSOCIATED SUBSTATIONS.
PLACE OF DELIVERY: CARRASCO SUBSTATION POPULATION OF ENTRE RÍOS CARRETERA COCHABAMBA - SANTA CRUZ.
DATE: 29-08-2019.

Slide

CONTRACTING PROCESS N °: ETR-GT-134-19 SECOND CALL FOR SUPPLY OF GATE-TYPE RETICULATED METALLIC STRUCTURES AND SUPPORT OF EQUIPMENT PROJECT OF 500 kV CARRASCO - SANTIVAÑEZ TRANSMISSION LINE AND ASSOCIATED SUBSTATIONS.
PLACE OF DELIVERY: CARRASCO SUBSTATION POPULATION OF ENTRE RÍOS CARRETERA COCHABAMBA - SANTA CRUZ.
DATE: 29-08-2019.

ACQUISITION PROCESS N °: ETR-GT-175-19 SUPPLY OF LOT N ° 2 LINE HARDWARE PROJECT 230kV LINE TRONCOS - GUARAYOS - TRINIDAD.
PLACE OF DELIVERY: GUARAYOS SUBSTATION AND PARAISO SUBSTATION, IN THE CITY OF TRINIDAD.

ACQUISITION PROCESS N ° ETR-GT-057-19 SUPPLY LOT N ° 1 - GLASS INSULATORS AND LOT N ° 2 - LINE HARDWARE “PROYECTO EÓLICO SANTA CRUZ”
PLACE OF DELIVERY: WARNES SUBSTATION, CITY OF SANTA CRUZ.

ACQUISITION PROCESS N °: ETR-GT-048-19 2ND CALL “SUPPLY OF: LOT N ° 2 CONTROL CABLES” EXPANSION OF THE SECOND THIRD TRANSMISSION LINE LA BELGICA - LOS TRONCOS.
PLACE OF DELIVERY: WARNES SUBSTATION, CITY OF SANTA CRUZ.
DATE: 31-03-2020.


CONTRACTING PROCESS Nº: ETR-GOM-086-19 “SUPPLY OF RETICULATED METAL STRUCTURES FOR MAINTENANCE OF LINES” - 115 AND 230 KV TRANSMISSION LINES.
PLACE OF DELIVERY: AROCAGUA SUBSTATION IN THE DEPARTMENT OF COCHABAMBA
DATE: MANUFACTURING


ACQUISITION PROCESS N ° ETR-GT-242-19 SUPPLY OF MATERIALS FOR GROUNDING LOT 1: BARE COPPER CABLE AND LOT 2: ACCESSORIES FOR GROUNDING PROJECT LINEA SANTIVAÑEZ - MIZQUE - SEHUENCAS 230 KV
PLACE OF DELIVERY:SANTIVAÑEZ SUBSTATION, COCHABAMBA DEPARTMENT.
DATE:MANUFACTURING


PUBLIC TENDER N ° QE 7968 PROVISION OF SPARE PARTS FOR GENERATORS
PLACE OF DELIVERY:YPFB TRANSPORTATION WAREHOUSE IN THE CITY OF SANTA CRUZ.
DATE: 22-03-2019.


CONTRACTING PROCESS Nº: 10005845 “VALVES AND ACCESSORIES”.
PLACE OF DELIVERY:REFINERIA GUILLERMO ELDER BELL, AVENIDA SANTOS DUMONT - FINAL SANTA CRUZ, BOLIVIA.
DATE: 23-12-2019.


CONTRACTING PROCESS Nº: 10005951 OBJECT: "PIPE AND WELDING ACCESSORIES.
PLACE OF DELIVERY:GUALBERTO VILLAROEL REFINERY, IN THE CITY OF COCHABAMBA.
DATE: 10-01-2020


PROVISION OF PROTECTED ALUMINUM CABLE 185 MM2 FOR 35 KV.
PLACE OF DELIVERY:CHIMORE SUBSTATION, IN THE CITY OF COCHABAMBA.
DATE: 22-02-2020.